Beaver Island ArchiveA primary-source archive & encyclopedia45°40′N 85°33′W · Lake Michigan
Colour scheme
Search

Event

King’s Highway road-construction project, 1970

Also 1970 Beaver Island road project · Beaver Island federal-aid road construction

Draft — sources verified, prose evolving

Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Dates1970-08-24 – 1970-08-26
WithinBeaver Island
ErasModern era
On this page
Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Dates
1970-08-24 – 1970-08-26
Kind
Construction
Where
Beaver Island
Along road
King's Highway
Eras
Modern era
Concepts
communityeconomygovernance
Within
Beaver Island

Summary

On August 24, 1970, a county-board announcement described a $94,466 federal-aid secondary road project on Beaver Island. The work covered 4.36 miles of King’s Highway, beginning 0.75 miles south of Saint James, and included grading, drainage structures, and a pit-run stabilizing course. A preconstruction meeting was scheduled for August 26.

Evidence and limits

The report names the Michigan State Highway Commission, Charlevoix County Road Commission, and Consumers Asphalt Company and describes matching federal and county/state financing. It is an announcement and preconstruction notice, not a completion certificate: no final road surface, exact alignment, contractor performance, or later maintenance history is inferred.

Open questions

  • Was the 4.36-mile project completed, and when was it paved?
  • Which state, county, or federal project files identify the exact termini and final cost?
  • What historic and current road feature corresponds to the reported King’s Highway segment?

See also

Sources

  1. Reports the August 24 county-board announcement, a $94,466 matching-funds project, a 4.36-mile King’s Highway segment beginning 0.75 miles south of Saint James, grading/drainage/pit-run work, and the August 26 preconstruction meeting; it does not report completion.
    data1 · beaver-island-archive · beaver_beacon · 1970-08_Beaver-Beacon
  2. The held nine-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1970-08_Beaver-Beacon
  3. Reports road widening, grading, and drainage work underway around St. James, with new blacktop expected in spring and more back roads included than first expected; it does not identify the exact segment, final cost, contractor, or completion date.
    data1 · beaver-island-archive · beaver_beacon · 1971-10_Beaver-Beacon
  4. The held eight-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1971-10_Beaver-Beacon

Added 1 August 2026 · revised 3 August 2026. Recent changes

Cite this article

Beaver Island Archive, “King’s Highway road-construction project, 1970”, https://beaverislandarchive.org/events/kings-highway-road-construction-project-1970/, accessed [date], citing Beaver Beacon, August 1970, “$94,466 Beaver Island Road Construction Project.” (and 3 further sources listed on the page).

Last revised 2026-08-03. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “King’s Highway road-construction project, 1970”RIS for “King’s Highway road-construction project, 1970”