Beaver Island ArchiveA primary-source archive & encyclopedia45°40′N 85°33′W · Lake Michigan
Colour scheme
Search

Event

McClure plugs its first 1961 well and moves to a site near Miller’s Marsh, 1961

Also October 1961 McClure second drilling site

Draft — sources verified, prose evolving

Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Dates1961-10 – 1961-12
WithinBeaver Island
ErasModern era
On this page
Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Dates
1961-10 – 1961-12
Kind
Business
Where
Beaver Island
Eras
Modern era
Concepts
economygeologyenvironment
Within
Beaver Island
Media
Beaver Island History Map, 1978 revision

Summary

By October 1961, McClure Oil Company had plugged its first Beaver Island well at 5,383 feet and moved men and equipment to a new site between the sawmill and Miller’s Marsh. The new hole was reported at 2,350 feet, with water supplied from the marsh about 2,000 feet away.

Evidence and limits

The reports record drilling status and local relative locations, not surveyed well positions, geological logs, permits, leases, or a final oil result. The November account is a later stage in the same reported 1961 operation: the Miller’s Marsh site had reached granite at 4,800 feet and was being abandoned for another location. The December report then places Well No. 3 at Iron Ore Bay, 3,798 feet deep, with a small show of oil and a possible fourth drilling planned for spring; these are reported stages, not a confirmed producing field.

Sources

  1. Reports the first well reaching 5,383 feet before being plugged, men and equipment moving to a new site between the sawmill and Miller’s Marsh, drilling reaching 2,350 feet there, and water supplied from the marsh about 2,000 feet away. It does not provide a well log, survey, permit, lease, or oil result.
    data1 · beaver-island-archive · beaver_beacon · 1961-10_Beaver-Beacon
  2. The held five-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1961-10_Beaver-Beacon
  3. Reports drilling stopping at the site between the sawmill and Miller’s Marsh after reaching granite at 4,800 feet without finding oil, with equipment planned for a new site across French Bay Road. It does not provide a well log, permit, lease, or a final oil result for the operation.
    data1 · beaver-island-archive · beaver_beacon · 1961-11_Beaver-Beacon
  4. The held five-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1961-11_Beaver-Beacon
  5. Reports Well No. 3 at Iron Ore Bay reaching 3,798 feet, with earth formations similar to Well No. 2 near the sawmill, a small show of oil, and a possible return the following spring for a fourth drilling. It does not provide a log, permit, lease, commercial-production result, or exact site survey.
    data1 · beaver-island-archive · beaver_beacon · 1961-12_Beaver-Beacon
  6. The held six-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 1961-12_Beaver-Beacon

Added 1 August 2026 · revised 3 August 2026. Recent changes

Cite this article

Beaver Island Archive, “McClure plugs its first 1961 well and moves to a site near Miller’s Marsh, 1961”, https://beaverislandarchive.org/events/mcclure-oil-first-well-plugged-new-site-1961/, accessed [date], citing Beaver Beacon, October 1961, “McClure Oil Company.” (and 5 further sources listed on the page).

Last revised 2026-08-03. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “McClure plugs its first 1961 well and moves to a site near Miller’s Marsh, 1961”RIS for “McClure plugs its first 1961 well and moves to a site near Miller’s Marsh, 1961”