Summary
The June–July 1972 Beaver Beacon reports that Durocher Dock and Dredge Company finished repairing the eroded Yacht Dock shoreline. This is the realized follow-up to the May announcement of the planned stone work.
Evidence and limits
The source does not provide a completion day, survey, cost, stone quantity, or as-built engineering record. The result is preserved as a newspaper report, not independently certified construction completion.
See also
Sources
- States that Durocher Dock and Dredge Company had finished repairing the Yacht Dock shoreline and describes the result as durable; it does not provide a completion day, engineering survey, cost, or as-built record.data1 · beaver-island-archive · beaver_beacon · 1972-06_Beaver-Beacon
- The held eight-page issue scan is paired with the OCR source and confirms the published notice or report; it does not expand the source-specific identity, event, or outcome claims.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1972-06_Beaver-Beacon
Added 1 August 2026 · revised 3 August 2026. Recent changes
Cite this article
Beaver Island Archive, “Completion of Yacht Dock beach repair, 1972”, https://beaverislandarchive.org/events/completion-of-yacht-dock-beach-repair-1972/, accessed [date], citing Beaver Beacon, June–July 1972, “Yacht Dock Completed.” (and 1 further source listed on the page).
Last revised 2026-08-03. Fill in [date] with the date you read it — this page is static and cannot know that.
BibTeX for “Completion of Yacht Dock beach repair, 1972”RIS for “Completion of Yacht Dock beach repair, 1972”