Beaver Island ArchiveA primary-source archive & encyclopedia45°40′N 85°33′W · Lake Michigan
Colour scheme
Search

Event

Beaver Island plans a water wagon for dry-season road grading, 2011

Also Beaver Island dusty roads water wagon 2011 · Charlevoix County Road Commission Beaver Island water wagon 2011

Draft — sources verified, prose evolving

Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Dates2011-03-11 – 2011-06
WithinBeaver Island
ErasModern era
On this page
Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Dates
2011-03-11 – 2011-06
Kind
Transportation
Where
Beaver Island
Carried out by
Charlevoix County Road Commission
Eras
Modern era
Concepts
transportationinfrastructurepublic-service
Within
Beaver Island

Summary

In March 2011, a forum announcement described a planned 2,500-gallon water wagon for Beaver Island roads. The June Beaver Beacon then reported that the Road Commission had sent the wagon to wet dry roadways so they could be graded during periods without rain; one lane-mile could be covered before refilling.

Evidence limits

The forum documents the planned equipment and intended use, while the June issue documents a deployment report. Neither source provides a complete operating record, mileage treated over the season, or effect on road conditions.

Sources

  1. Rich Gillespie announced that, working with Charlevoix County Road Commission manager Pat Harmon, the island would have a 2,500-gallon water wagon for dry-season road wetting before grading. This is a contemporaneous community announcement; it does not establish deployment frequency, mileage treated, or later effectiveness.
    forum · www.beaverislandforum.com · 03 · t003243
  2. Beaver Beacon, June 2011, "Water Wagon".
    Reports that the Road Commission sent a 2,500-gallon water wagon to wet dry roads before grading, with one lane-mile covered before refilling. It confirms deployment but does not establish a complete operating record or later effectiveness. No public copy of this file is known; the archive holds one and can provide it on request.
    data1 · beaver-island-archive · beaver_beacon · 2011-06_Beaver-Beacon
  3. The held June issue scan confirms the water-wagon follow-up.
    data1 · beaver-island-archive · scans · beaver_beacon · issues · 2011-06_Beaver-Beacon

Added 7 August 2026. Recent changes

Cite this article

Beaver Island Archive, “Beaver Island plans a water wagon for dry-season road grading, 2011”, https://beaverislandarchive.org/events/beaver-island-road-commission-water-wagon-2011/, accessed [date], citing Beaver Island Forum, “Help For Dusty Roads”, March 11, 2011. (and 2 further sources listed on the page).

Last revised 2026-08-07. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “Beaver Island plans a water wagon for dry-season road grading, 2011”RIS for “Beaver Island plans a water wagon for dry-season road grading, 2011”