Summary
The surviving May 1, 2000 Beaver Beacon page reports the accepted settlement from the Great Lakes Energy three-phase cable inquiry. The monthly payment was reduced from $12.75 to $10.25 and capped at “not to exceed” $10.25, future cable replacement was assigned to all GLE ratepayers, and the settlement covered the 30-year agreement and future generation or transmission equipment.
Evidence limits
Only one page survives in the accessible source. No held issue PDF or complete
OCR is available in /data1; this record preserves the page transcription and
its provenance rather than implying that the full May issue was reviewed.
Sources
- The available portal transcription reports that the Attorney General’s accepted settlement reduced the monthly rate from $12.75 to $10.25, capped it at not more than $10.25, assigned future cable replacement costs to all GLE ratepayers, and protected Islanders through the 30-year agreement.data1 · beaver-island-archive · scans · beaver_beacon · issues · 2000-05_Beaver-Beacon.page1
- Beaver Beacon, May 1, 2000, page-1 source provenance record.The provenance record documents the CMU portal source, one-page availability, missing static PDF, transcription method, copyright status, and the incomplete-at-source limitation. No public copy of this file is known; the archive holds one and can provide it on request.data1 · beaver-island-archive · scans · beaver_beacon · issues · 2000-05_Beaver-Beacon.page1.provenance
Added 5 August 2026. Recent changes
Cite this article
Beaver Island Archive, “Beaver Island’s Great Lakes Energy cable settlement caps the power inquiry at $10.25 per month in May 2000”, https://beaverislandarchive.org/events/beaver-island-great-lakes-energy-settlement-2000/, accessed [date], citing Beaver Beacon, May 1, 2000, surviving page 1, “So How Did the 30-Year Cable Purchase Come Out?” (and 1 further source listed on the page).
Last revised 2026-08-05. Fill in [date] with the date you read it — this page is static and cannot know that.
BibTeX for “Beaver Island’s Great Lakes Energy cable settlement caps the power inquiry at $10.25 per month in May 2000”RIS for “Beaver Island’s Great Lakes Energy cable settlement caps the power inquiry at $10.25 per month in May 2000”