Beaver Island ArchiveA primary-source archive & encyclopedia45°40′N 85°33′W · Lake Michigan
Colour scheme
Search

Event

Customer reports possible Great Lakes Energy heat-meter double count in budget plans, 2009

Also Great Lakes Energy budget plan heat meter error 2009

Draft — sources verified, prose evolving

Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
TypeEvent
Date2009-09-15
WithinBeaver Island
ErasModern era
On this page
Locator map: Beaver Island highlighted within the Beaver Island archipelago
Took place at Beaver IslandLocator plate © OpenStreetMap contributors (ODbL 1.0); depths NOAA; names USGS GNIS. How the plates are drawn.
Event
Date
2009-09-15
Kind
Service issue
Where
Beaver Island
Carried out by
organization/great-lakes-energy
Eras
Modern era
Concepts
utilitieseconomytechnology
Within
Beaver Island

Summary

In September 2009, a Beaver Island customer reported that Great Lakes Energy budget-plan calculations may have counted a separate electric-heat meter twice. The report cited unusually large plan increases and a utility contact who allegedly acknowledged a possible software problem.

Evidence limits

This is a single customer report preserved in a forum post. It does not establish the scope of the problem, the utility’s final diagnosis, or whether any bills were corrected.

Sources

  1. A customer compared bills and reported budget-plan increases of more than 25 percent and 45 percent for two households, then said a Great Lakes Energy marketing representative acknowledged a possible software problem. The post does not preserve a utility correction, affected-account count, billing records, or final resolution.
    forum · www.beaverislandforum.com · 01 · t001911

Added 7 August 2026. Recent changes

Cite this article

Beaver Island Archive, “Customer reports possible Great Lakes Energy heat-meter double count in budget plans, 2009”, https://beaverislandarchive.org/events/beaver-island-great-lakes-energy-budget-plan-meter-error-report-2009/, accessed [date], citing Beaver Island Forum, “Great Lakes Energy Budget Plan With A Electric Heat Meter,” September 15, 2009..

Last revised 2026-08-07. Fill in [date] with the date you read it — this page is static and cannot know that.

BibTeX for “Customer reports possible Great Lakes Energy heat-meter double count in budget plans, 2009”RIS for “Customer reports possible Great Lakes Energy heat-meter double count in budget plans, 2009”