Summary
The April 1959 Beaver Beacon reports pressure-treated pilings for the new dock were due from California on May 15, with Waterways Commission bidding expected and work anticipated to begin June 1.
Evidence limits
The notice is a construction schedule, not an order, bid, contract, engineering plan, or completion record.
Sources
- Reports that St. James Township received a delivery date for pilings ordered for the new dock, that the pressure-treated pilings would come from California on May 15, and that the Waterways Commission was expected to let bids with work starting June 1. It does not provide an order, bid notice, engineering plan, contract, or completion record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-04_Beaver-Beacon
- The held four-page issue PDF is paired with the canonical OCR source and confirms the planned piling delivery and construction schedule; it does not establish bidding or completion.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-04_Beaver-Beacon
- Reports that the contract for the municipal pleasure-craft dock and harbor master's building had been let to Sears Marine Construction of Traverse City. It does not provide the contract, plans, cost, construction log, or completion record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-08_Beaver-Beacon
- The held five-page issue PDF is paired with the canonical OCR source and confirms the reported contract award; it does not expand the engineering or completion record.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-08_Beaver-Beacon
- Reports Sears contractors on Beaver Island with heavy equipment driving long pilings into the harbor edge for the new pleasure-craft dock. It does not provide a construction log, plans, costs, inspection, or completion record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-09_Beaver-Beacon
- The held three-page issue PDF is paired with the canonical OCR source and confirms the reported piling work; it does not expand the engineering or completion record.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-09_Beaver-Beacon
- Reports that the municipal pleasure-craft dock was taking shape, with the main stem of the T nearly completed and the harbor master’s office nearly complete. It does not provide plans, costs, inspection, or a final completion record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-10_Beaver-Beacon
- The held four-page issue PDF is paired with the canonical OCR source and confirms the construction-progress report; it does not expand the engineering or completion record.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-10_Beaver-Beacon
- Reports that the new dock was complete except for lighting and that a dedication ceremony was planned for the following summer. It does not provide an inspection certificate, final cost, lighting completion, or dedication record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-11_Beaver-Beacon
- The held five-page issue PDF is paired with the canonical OCR source and confirms the reported near-completion; it does not expand the engineering or dedication record.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-11_Beaver-Beacon
- Reports that the new dock was complete except for lighting and that a dedication ceremony was planned for the following summer. It does not provide an inspection certificate, final cost, lighting completion, or dedication record. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1959-12_Beaver-Beacon
- The held five-page issue PDF is paired with the canonical OCR source and confirms the reported near-completion; it does not expand the engineering or dedication record.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1959-12_Beaver-Beacon
Added 3 August 2026. Recent changes
Cite this article
Beaver Island Archive, “St. James Township receives a piling delivery date for the new dock, 1959”, https://beaverislandarchive.org/events/beaver-island-dock-piling-delivery-and-construction-plan-1959/, accessed [date], citing Beaver Beacon, April 1959, “PILING UP.” (and 11 further sources listed on the page).
Last revised 2026-08-03. Fill in [date] with the date you read it — this page is static and cannot know that.