- Dates
- 2021-09-13 – 2021-09-29
- Kind
- Procurement
- Where
- Beaver Island Community School
- Carried out by
- Beaver Island Community School
- Eras
- Modern era
- Concepts
- educationinfrastructureprocurementbuilding-and-vernacular-architecture
- Within
- Beaver Island
Summary
In September 2021, Beaver Island Community School solicited sealed bids to repair the boiler-room roof. The scope included replacing damaged roof decking, ventilation and insulation-baffle work, flashing around boiler stacks, new ice-and-water shielding, and replacement shingles across the roof deck.
Evidence limits
This is a first-party procurement notice supported by the linked architectural drawings. It documents the proposed scope, bidding rules, and target completion date; it does not establish the winning bidder, contract value, construction, or final quality.
Sources
- The school linked a September 13 formal RFP and architectural drawings for boiler-room roof repair. The RFP required sealed bids by 3:30 p.m. September 29, public opening at 3:31 p.m., licensing and insurance documentation, and proposed completion by November 15. The forum notice and linked documents establish procurement terms, not a bid award, contractor, price, or completed work.forum · www.beaverislandforum.com · 16 · t016738
Added 9 August 2026. Recent changes
Cite this article
Beaver Island Archive, “Beaver Island Community School solicits bids for boiler-room roof repair, 2021”, https://beaverislandarchive.org/events/beaver-island-community-school-boiler-room-roof-repair-rfp-2021/, accessed [date], citing Beaver Island Community School, “BICS Request for Bids-Roof Repair,” Beaver Island Forum, September 14, 2021..
Last revised 2026-08-09. Fill in [date] with the date you read it — this page is static and cannot know that.
BibTeX for “Beaver Island Community School solicits bids for boiler-room roof repair, 2021”RIS for “Beaver Island Community School solicits bids for boiler-room roof repair, 2021”