
- Date
- 1997
- Kind
- Construction
- Where
- Beaver Island
- Eras
- Modern era
- Concepts
- constructioninfrastructuretransportationcommunitycommunication
- Within
- Beaver Island
Summary
The October 1997 Beaver Beacon profiles Bobbi Welke, the Michigan Department of Transportation project manager for the $79.4 million second Blue Water Bridge in Port Huron. It reports that the 1.22-mile span was completed on time and on budget, and connects Welke’s engineering career with her Beaver Island family cabin tradition.
Evidence limits
This is a newspaper profile rather than a transportation-agency completion record or engineering project file.
Sources
- Profiles 37-year-old MDOT project manager Bobbi Welke, who managed the $79.4 million second Blue Water Bridge in Port Huron. The article says the 1.22-mile span opened on time and on budget, and identifies Welke as Robert Welke’s daughter and a Beaver Island family-cabin owner building a cabin of her own. The holding institution's portal restricts automated access; the archive holds a copy of this issue and can provide it on request.data1 · beaver-island-archive · beaver_beacon · 1997-10_Beaver-Beacon
- The held issue scan confirms the Bobbi Welke profile.data1 · beaver-island-archive · scans · beaver_beacon · issues · 1997-10_Beaver-Beacon
Added 5 August 2026. Recent changes
Cite this article
Beaver Island Archive, “Bobbi Welke leads the second Blue Water Bridge project in 1997”, https://beaverislandarchive.org/events/beaver-island-bobbi-welke-blue-water-bridge-1997/, accessed [date], citing Beaver Beacon, October 1997, “A Woman Built the new Blue Water Bridge?” and “Bobbi Welke, Bridge Builder.” (and 1 further source listed on the page).
Last revised 2026-08-05. Fill in [date] with the date you read it — this page is static and cannot know that.
BibTeX for “Bobbi Welke leads the second Blue Water Bridge project in 1997”RIS for “Bobbi Welke leads the second Blue Water Bridge project in 1997”